Drilling and Pasting Into of Flush Lights in Air Traffic Areas
We drill the survey of drillings for flush lights with an hydraulic drill rig or with our drill trailer with petrol engine. We have all prevalent drill diameters, e.g. the survey of 8″ or 12″ installation hulls, in stock. We have also double shot blasting at our disposal and the possibility of horizontal section to produce step drillings.
The placing of the installation hull occurs through an installation gauge on a PC-mortarboard. Finally, the balanced ring gab will be casted with a 2K-EP-casting mortar.
We can affect the gluing with our EP casting mortar BETOPOX VM 99-04 in recesses of steel, as well as e.g. of pads on drill platforms.